Common faults and repair methods of plastic crushers
If abnormal noise or material blockage is found during the operation of the pulverizer, or the bearing or motor is overheated, stop feeding, cut off the power supply, and check after the rotor stops to eliminate the fault. After the work is finished, it must be idling for 2 minutes to completely crush and discharge the materials in the machine before it can stop. The sequence of stopping is reverse to that of starting. After the shutdown, the pulverizer shall be shut down and checked, and the problems shall be solved in time. The magnetic impurities on the magnetic plate at the entrance of the shredder must be cleaned.